hiring route 2 of 5

Hiring a day-rate contractor developer

A contractor brings skills for weeks or months, paid by the day and often through their own limited company. You direct the work, so it suits teams with someone technical to lead it. The total cost moves with the scope, and the size of your company decides who must judge the contractor’s tax status under IR35.

contractor.md
reading
About 7 minutes
updated
25 November 2026
Speed to start
Cost
Your control
Low risk
Your time

Our rating for a typical first build of a defined product. Why these scores

the short verdict

Who it suits, and who it does not

A good fit for

  • Extra hands for a team that already has someone technical to lead them
  • A specialist, such as a DevOps or machine learning engineer, for a set period
  • Keeping work moving while you recruit a permanent developer
  • A burst of work with a clear end, directed by you

The wrong choice for

  • A fixed budget for a defined outcome, because a day rate moves with scope
  • Founders with nobody to direct the work day to day
  • Core work you will need for years, where a permanent hire may cost less
  • Anyone who has not yet checked which side of the IR35 decision they are on

what it costs

How the money works

You pay an agreed rate for each day worked, so the total depends on how many days the work takes.

ItemFigureDetail
Full-stack developer, median advertised day rate£50010th to 90th percentile £363 to £650, six months to 24 November 2026 (ITJobsWatch (opens in a new tab))
React developer£51810th to 90th percentile £386 to £938 (ITJobsWatch (opens in a new tab))
iOS developer£42010th to 90th percentile £318 to £537 (ITJobsWatch (opens in a new tab))
DevOps engineer£53210th to 90th percentile £400 to £736 (ITJobsWatch (opens in a new tab))
Machine learning engineer£56510th to 90th percentile £465 to £738 (ITJobsWatch (opens in a new tab))
60 days at the full-stack median£30,000Our own sum: 60 days at £500, before any VAT or agency margin (ITJobsWatch (opens in a new tab))

Put your own figures side by side with the other routes in the True Cost Calculator.

What contractors advertise, by role

These are the median day rates in UK contract job adverts for the six months to 24 November 2026, with the range covering the middle 80% of adverts (the 10th to 90th percentile). They are advertised rates, not quotes and not what anyone was actually paid (ITJobsWatch (opens in a new tab)).

Advertised UK contract day rates, six months to 24 November 2026
RoleMedian day rate10th to 90th percentileAdvertsSource
Full-stack developer£500£363 to £650407ITJobsWatch (opens in a new tab)
Front-end developer£500£400 to £638161ITJobsWatch (opens in a new tab)
React developer£518£386 to £938204ITJobsWatch (opens in a new tab)
Python developer£538£400 to £750436ITJobsWatch (opens in a new tab)
Software developer£529£363 to £631463ITJobsWatch (opens in a new tab)
iOS developer£420£318 to £53766ITJobsWatch (opens in a new tab)
Android developer£45010th not shown; 90th £59655ITJobsWatch (opens in a new tab)
DevOps engineer£532£400 to £7361,125ITJobsWatch (opens in a new tab)
Machine learning engineer£565£465 to £738110ITJobsWatch (opens in a new tab)
UX designer£450£360 to £588131ITJobsWatch (opens in a new tab)
Web developer£438£311 to £72536ITJobsWatch (opens in a new tab)

The full list, refreshed monthly, is on developer day rates in the UK. If the contractor is registered for VAT, VAT at the standard rate of 20% is added to the day rate, which is a real cost if your own business is not registered (GOV.UK (opens in a new tab)).

A day rate is not a fixed price

A day rate fixes the price of a day, not the price of the work. If the job takes longer than planned, or the scope grows, the bill grows with it. Sixty days at the full-stack median is £30,000, and eighty days is £40,000 (our own sums from the ITJobsWatch (opens in a new tab) median).

Scope growth is common in every kind of project. PMI’s 2018 Pulse of the Profession, as reported by ITWeb, found scope creep in 52% of projects completed in the previous year, across all project types and not only software (ITWeb (opens in a new tab)).

To keep a contractor’s budget under control, write a brief with acceptance criteria, agree a cap on the days for each piece of work, and review progress every week. The Brief Builder helps with the first of those.

IR35: who decides the contractor’s status

The off-payroll working rules, usually called IR35, are about contractors who work through their own company, known as an intermediary. They ask whether, for tax, the contractor would be an employee if they were engaged directly. Who has to answer that depends on the size of your company (HMRC (opens in a new tab)).

  • If your company is medium or large (and outside the public sector), you decide the contractor’s employment status, and you must give them a status determination statement with your reasons (HMRC (opens in a new tab)).
  • If your company is small and outside the public sector, the contractor’s own company decides (HMRC (opens in a new tab)).
  • If your company is medium or large and pays the contractor’s company directly, and the rules apply to the work, you are the fee-payer and the deemed employer: you deduct tax and National Insurance, and pay employer National Insurance and, where you are liable, the Apprenticeship Levy (HMRC (opens in a new tab)).

A medium or large client must also take reasonable care, keep records and answer a disagreement about its decision within 45 days. A small client must confirm its size if asked (HMRC (opens in a new tab)).

We give no IR35 verdict

Status depends on the facts of each engagement. HMRC’s CEST tool (opens in a new tab) gives HMRC’s view, and HMRC says it will stand by the result as long as the information you give remains accurate. There must be a contract in place, or one expected. Our guide to IR35 when you hire a contractor developer goes further.

Is your company small?

For these rules, a company is small if it meets two or more of these three tests (Companies Act 2006 s.382 (opens in a new tab)):

The turnover and balance sheet figures went up for financial years beginning on or after 6 April 2025, and a company counts as medium or large only once it meets the criteria for two consecutive financial years. Because of a transitional rule, HMRC says the earliest tax year the new figures can affect a client is 2027/28 (HMRC ESM10006A (opens in a new tab)). Some commentary gives an earlier date; we follow HMRC’s own manual.

A new startup is likely to be small on these tests, which leaves the status decision with the contractor’s company. That does not make the question go away. It only changes who answers it.

Who owns the code a contractor writes

A contractor is not your employee, so the rule that gives an employer the copyright in an employee’s work does not help you (CDPA s.11 (opens in a new tab)). Without a written assignment signed by the contractor, or by their company, the code stays theirs (CDPA s.90(3) (opens in a new tab)).

Put the assignment in the contract before work starts, ask for the code in your repository from day one and keep every account in your name. If they will see personal data, add a processor contract covering UK GDPR Article 28 (opens in a new tab).

Finding and checking a contractor

Contractors come through agencies, job boards, contract platforms and referrals. Whichever way you find one, check them yourself before a long engagement: a short paid test task, a technical interview and references. The Vetting Kit has all three.

If nobody on your side can set the tasks and review the code, a contractor is hard to get value from. Then a fixed-price team for a defined outcome, or a permanent hire for long-running work, may suit you better. The True Cost Calculator puts the numbers side by side.

our rating

Why we scored it this way

Each score runs from 1 to 5, and higher is always better for you: 5 for risk means the least risk, 5 for your time means the least of it. They are our judgement for a typical first build of a defined product, not a measurement.

Speed to start

Contractors can often start at short notice and be useful within days.

Cost

A senior day rate is high, and the total grows with every extra day the work takes.

Your control

You direct the work day to day, which is real control if you have the skills to use it.

Low risk

IR35, IP and scope all need managing, though a signed assignment and a status check cover the big ones.

Your time

You set the tasks, review the work and keep an eye on the days.

before you start

A checklist for this route

  1. Write a brief with acceptance criteria before you talk to anyone
  2. Check your company against the small company test
  3. If you are medium or large, run CEST and issue a status determination statement
  4. If you are small, ask the contractor how their company has assessed status
  5. Put a signed IP assignment in the contract
  6. Agree a cap on days for each piece of work
  7. Check whether VAT will be added to the day rate
  8. Give access to a repository and accounts in your name
  9. Add a processor contract if they will see personal data
  10. Run a paid test task before a long engagement

Print it, or copy it into your project notes. General information, not legal or tax advice.

Questions people ask

What is a typical contractor developer day rate in the UK?

The median advertised rate for a full-stack developer was £500 a day in the six months to 24 November 2026, with the middle 80% of adverts between £363 and £650 (ITJobsWatch (opens in a new tab)). Rates vary by skill, as the table above shows.

Who decides IR35 status if my startup is small?

If your company is small and outside the public sector, the contractor’s own company decides (HMRC (opens in a new tab)). Check whether you are small with the test in Companies Act s.382 (opens in a new tab). We give no verdict on any engagement; CEST (opens in a new tab) gives HMRC’s view.

When do the new small company thresholds apply to IR35?

HMRC’s manual says the earliest tax year the new figures can affect a client is 2027/28, because of a transitional rule (HMRC ESM10006A (opens in a new tab)).

Does a contractor own the code they write for me?

Yes, unless they assign it to you in writing, signed by them or their company (CDPA s.90(3) (opens in a new tab)). The employer rule in section 11 (opens in a new tab) covers employees, not contractors.

Can I agree a fixed price with a contractor?

You can ask, and some will quote for a defined piece of work. Then you need what a fixed price always needs: a written scope, acceptance criteria and a way to price changes. See the fixed-price team page for how that works.

the other four

Compare it with the other routes

  1. freelancer.md

    Freelancer through a marketplace

    Best for: A small, well-defined job you can describe on one page.

    Watch for: Platform fees, uneven quality, and who owns the code.

    Speed to start
    Cost
    Your control
    Low risk
    Your time
  2. employee.md

    Permanent hire

    Best for: Software that is the business, with work every week for years.

    Watch for: Months to hire, employer costs, and one person holding everything.

    Speed to start
    Cost
    Your control
    Low risk
    Your time
  3. team.mdwhat we sell

    Fixed-price team

    Best for: A defined product or feature, with a budget and a date.

    Watch for: Scope must be written down; changes go through change control.

    Speed to start
    Cost
    Your control
    Low risk
    Your time
  4. offshore.md

    Offshore or nearshore team

    Best for: Long-running work you can manage across time zones and contracts.

    Watch for: Another country’s law, data transfers and management time.

    Speed to start
    Cost
    Your control
    Low risk
    Your time

Or see all five side by side on five ways to hire.

Not sure which way to hire?

The free Hire Route Finder asks ten questions about your project, budget and team, then shows the route that fits, what it really costs and what to watch for. No sign-up, nothing leaves your browser.

Sources

  1. ITJobsWatch: UK IT job market statistics from advertised rates and salaries (opens in a new tab)
  2. ITJobsWatch: Full-Stack Developer contract rates (opens in a new tab)
  3. ITJobsWatch: Front-End Developer contract rates (opens in a new tab)
  4. ITJobsWatch: React.js Developer contract rates (opens in a new tab)
  5. ITJobsWatch: Python Developer contract rates (opens in a new tab)
  6. ITJobsWatch: Software Developer contract rates (opens in a new tab)
  7. ITJobsWatch: iOS Developer contract rates (opens in a new tab)
  8. ITJobsWatch: Android Developer contract rates (opens in a new tab)
  9. ITJobsWatch: DevOps Engineer contract rates (opens in a new tab)
  10. ITJobsWatch: Machine Learning Engineer contract rates (opens in a new tab)
  11. ITJobsWatch: UX Designer contract rates (opens in a new tab)
  12. ITJobsWatch: Web Developer contract rates (opens in a new tab)
  13. VAT rates (GOV.UK) (opens in a new tab)
  14. Three top drivers of project success, reporting PMI Pulse of the Profession 2018 (ITWeb, 5 April 2018) (opens in a new tab)
  15. Understanding off-payroll working (IR35) (HMRC, updated 26 February 2026) (opens in a new tab)
  16. April 2021 changes to off-payroll working for clients (HMRC, updated 30 August 2024) (opens in a new tab)
  17. Check employment status for tax (CEST) (HMRC, updated 30 April 2025) (opens in a new tab)
  18. Companies Act 2006, section 382: companies qualifying as small (legislation.gov.uk) (opens in a new tab)
  19. Employment Status Manual ESM10006A: small company thresholds (HMRC) (opens in a new tab)
  20. Copyright, Designs and Patents Act 1988, section 11 (legislation.gov.uk) (opens in a new tab)
  21. Copyright, Designs and Patents Act 1988, section 90 (legislation.gov.uk) (opens in a new tab)
  22. UK GDPR Article 28: processor (legislation.gov.uk) (opens in a new tab)

Links checked 25 November 2026.